A POPULAR Borders footbridge which was closed for three years to facilitate repairs is set to reopen this week.

The local authority closed the Boleside Road footbridge, which carries a footpath across the former Selkirk Branch near Galashiels in the Scottish Borders in 2020 after raising concerns over its condition.

READ MORE: Borders butcher wins ‘best steak pie' award for south east

At that time it was estimated that the work would take three months however work was halted during the Covid-19 pandemic.

The former railway structure held in high regard by those who have frequented it over the years, not least because of its fascinating backstory.

Peeblesshire News:

The Edinburgh and Hawick Railway was opened in 1849 by the North British Railway and formed the first part of the line from Edinburgh to Carlisle.

The railway through Galashiels was initially known as the Border Union, but in 1862 it was officially named the Waverley Line, to emphasise the connection with the celebrated novelist Sir Walter Scott, as nearby Abbotsford increased in popularity as a literary shrine.

READ MORE: Traffic Scotland issues advice for drivers in wet weather

In 1856 the branch line opened to Selkirk although this footbridge doesn’t show up on the map until 1930.

It’s possible that a later footbridge was required at this location to improve access from the developing areas of housing to the east end of Abbotsford Road with the river for recreational purposes.

Due to the development of transport by road the Selkirk line was closed to passenger transport in 1951 and to goods in 1964, at which point the footbridge became redundant.

READ MORE: Where and when to watch organised fireworks displays in Borders

However, up until its recent closure, the public continued to make use of the structure as it spans the remaining embankments and links a late 20th century housing estate to the north west directly to those much-needed walks by the water.

The project was carried out by Balfour Beattie on behalf of National Highways Historical Railways Estate.

The bridge will be open to the public from Friday November 3.